输电塔线体系风致覆冰脱落动力响应的研究

合同范本 |

时间:

2021-07-22 09:48:38

|

工程学报,2010,23(1):76-85.

LI Xin-ye, ZHANG Hua-biao, HOU Shu-jun, et al. Theoretical and numerical analysis of galloping of iced power transmission lines\[J\].Journal of Vibration Engineering, 2010,23(1):76-85. (In Chinese)

[6] 王丽新,杨文兵,杨新华,等. 输电线路舞动的有限元分析\[J\]. 华中科技大学学报:城市科学版,2004, 21(1):76-80.

WANG Li-xin, YANG Wen-bing, YANG Xin-hua, et al. Finite element analysis for galloping process of transmission lines\[J\].J of HUST:Urban Science Edition, 2004,21(1):76-80. (In Chinese)

[7] 杜运兴,孙倩. 山区覆冰输电塔线体系风致不平衡张力的研究\[J\]. 湖南大学学报:自然科学版,2014,41(4):72-77.

DU Yun-xing, SUN Qian. Analysis of the wind-induced unbalance tension of iced transmission tower-line system in mountains areas \[J\].Journal of Hunan University: Natural Sciences, 2014,41(4):72-77. (In Chinese)

[8] 刘振亚.国家电网公司输变电工程典型设计500 kV输电线路\[M\].北京:中国电力出版社,2005:188-191.

LIU Zhen-ya. Power transmission project typical design of state gird corporation of China 500 kV transmission line branch\[M\]. Beijing: China Electric Power Press, 2005: 188-191. (In Chinese)

[9] KLMN T.Dynamic behavior of iced cables subjected to mechanic shocks \[D\].Quebec : University of Quebec,2007.

[10]DRUEZ J, LOUCHEZ S, BOUCHARD G. Study of ice-shedding phenomenon on cables\[C\]//Proceeding of the 9th International Conference of offshore

[11]PHAN C L,MOCOMBER P. Adhesion of rime and glaze on conductors protected by variousmaterials\[J\]. Transactions CSME, 1976, 4(4): 204-208.

[12]LAFORTE J L,PHAN C L. Adhesion of ice on aluminum conductor and crystal size in the surface layer\[R\]. Alaska: CRREL Special Report, 1983: 83-91.

[13]沈国辉,徐晓斌,楼文娟,等.导线覆冰脱冰有限元模拟方法的适用性分析\[J\]. 工程力学,2011,28(10):9-15.

SHEN Guo-hui, XU Xiao-bin, LOU Wen-juan, et al. Applicability analysis of finite element methodologies to simulate the ice-accreting and ice-shedding on transmission lines \[J\]. Engineering Mechanics, 2011,28(10):9-15. (In Chinese)

[14]胡位勇,严波,程皓月,等.输电塔线体系断线动力响应及杆塔破坏模拟研究\[J\].应用力学学报,2012,4(29):431-436.

HU Wei-yong, YAN bo, CHENG Hao-yue, et al. Numerical investigation on dynamic response and failure of transmission line and tower after wire breaking \[J\].Chinese Journal of Applied Mechanics, 2012,4(29):431-436. (In Chinese)

[15]沈世钊,徐崇宝,赵臣.悬索桥结构设计\[M\].北京:中国建筑工业出版社,1997:67-99.

SHEN Shi-zhao, XU Chong-bao, ZHAO Chen. The structural design of suspension bridges\[M\]. Beijing: China Architecture & Building Press, 1997:67-99.(In Chinese)

[16]廖圆圆,李周,王荣辉,等. 精确索单元法在找形及无应力索长计算中的应用\[J\]. 中外公路,2011, 31(6):33-37.

LIAO Yuan-yuan, LI Zhou, WANG Rong-hui,et al. Applications of accurate cable element method in form finding and unstressed cable length calculation\[J\]. Journal of China & Foreign Highway, 2011, 31(6):33-37. (In Chinese)

[17]MCCOMBER P, PARADIS A. A cable galloping model for thin ice accretions\[J\]. Atmospheric Research, 1998, 46(1): 13-25.

[18]楼文娟,杨伦,潘小涛. 覆冰导线舞动的非线性动力学及参数分析\[J\]. 土木工程学报,2014, 47(5):26-33.

LOU Wen-juan, YANG Lun, PAN Xiao-tao. Nonlinear dynamics and parametric analysis for galloping response of iced conductor\[J\].China Civil Engineering Journal, 2014, 47(5):26-33. (In Chinese)

[19]GB50545-2010 110~750 kV架空输电线路设计规范\[S\].北京:中国计划出版社,2010: 28-31.

GB 50545-2010 Code for design of 110~750 kV overhead transmission line\[S\]. Beijing: China Planning Press, 2010: 28-31. (In Chinese)

[20]李喜来,王开明,尹鹏.大跨越输电塔动力特性\[J\].电力建设,2010, 5(31):43-48.

LI Xi-lai,WANG Kai-ming,YIN Peng.Dynamic behavior of large-span power transmission tower\[J\]. Electric Power Construction,2010, 5(31):43-48. (In Chinese)

延伸阅读
工程测量求职信范文3篇  时间一晃而过,我们又将面临求职找工作的挑战,感觉我们很有必要写求职信了。求
2023-06-16
工程检测个人工作总结范文3篇  工程检测是确保建筑质量的重要组成部分,在建筑工程施工的每个环节,工程
2023-06-03
工程成本工作计划3篇  做好日常费用报销和采购核算工作,通过加强自身学习、努力掌握生产工艺流程以及严
2023-05-24
公司工程邀标通知书范本五篇  中标人确定后,招标人应当向中标人发出中标通知书。以下是工作范文网小编为
2023-05-15
企业工程预算员岗位职责两篇  工程预算员岗位职责(一)  1、编制各工程的材料总计划,包括材料的规格
2023-05-05